FAQ (Frequently asked questions)

When swing internal doors should be installed?

Interior doors should be installed after flooring. It is recommended to install the door after the first wall painting.


When does invisible door should be installed?

Patented invisible aluminium frames for invisible doors (door flush to the wall) should be installed before forming the walls (before plastering or plasterboard).

The door leaf for invisible frame could be veneered or painted. Or you can use wallpapers on the door leaf just to hide the door in the wall.


How to determine interior door opening sides?

Swing door opening side is determined according to the side of door hinges when we open the door. 


Do you provide any warranty for your doors?

We provide 24 months warranty for our doors.